Vai direttamente ai contenuti
Local Warehouse Delivery
Worldwide Free Shipping
30 Days Return
Local Warehouse Delivery
Worldwide Free Shipping
Local Warehouse Delivery
Worldwide Free Shipping
30 Days Return
Local Warehouse Delivery
Worldwide Free Shipping
Local Warehouse Delivery
Worldwide Free Shipping
30 Days Return
Local Warehouse Delivery
Worldwide Free Shipping
HychikaHychika
12V Drill Driver Evaluation And Acceptance Criteria

12V Drill Driver Evaluation And Acceptance Criteria

I Performance

I.A.1 No Load RPM, 0-575+/-10%

I.A.2 Power Input,

I.A.3

Temperatures:            

Motor Enclosure Outside:       50°C Max.

Motor Bearings:      120°C Max. 

Other bearings:      93°C Max.

Motor Case:   80°C Max.

Battery Pack: 70°C Max. Discharge40'C Max. Charge
Surfaces normally contacted by a user*    Per EN60745

I.B Practical Performance

Each sample will be tested to verify the minimum numbers listed below per charge using the battery pack (1.5Ah or3 Ah)

Note: White pine to be air or kiln dried 1 1% moisture content.
Rest 5min. each 50pcs wood holes.

I.C.1.Switch/switch assembly-
               Pre-travel - For information only
               Force to actuate switch - For information only                                                     
Force to hold switch in full on - For information only                                         Force to override switch lock-off - Must withstand 50 lb. force                       applied to actuator withoutOverriding the lock-offmechanism.


I.C.2. Switch Endurance - Each sample must achieve a minimum of 50,000 cycles without failure.

II. Product Life
II.A. Product Fixture Life -Each sample must achieve a minimum life of 50 hours. (Use a test voltage of 10.8Vdc.)

II.B. Use Test - Each of the 5 samples must be tested to verify the minimum number ofholes/screws listedbelow, Each sample must complete a minimum of 60 total application steps 12 complete test cycles, wheretest cycle consists of the 5 application steps A-E as below).

Conduct cycles 1 -3 using 1.5Ah pcak.                                                   Conduct cycles 4-9 using 3.0.Ah pack.                                                   Conduct cycles 10-12 using 1.5 Ah pack.

Chucks should be tightened by hand at the beginning of each power pack. Chucks should not loosen morethan once per power pack during testing. A “loosening" occurs when the tool can not continue drilling unlessthe chuck is re-tightened by hand. Slips of the bit during testing should not be considered a failure as long asdrilling can continue without re-tightening of the chuck, No malfinction of tool is allowed throughouttesting. No malfunction of battery including melting, heat deformation, and capacity to take a charge anddischarge is allowed throughout testing.

II.C.Use Test Log- Provide copy oftest log to project engineer for reference.

I.D, Jam Test -Each sample must withstand a minimum of 50 jams without malfunctioningSlips during jam testing are not considered a failure.Jam testing with an inserted washer to prevent clutch slipping must withstand a minimum of 50 jams 

Ill. Product Safety
Ill.A. Each sample must be free from any problems that could result in a safety risk to the operator.
Ill.B. Perform drop (impact resistance) testing on (3) samples per appropriate regulatory standard.

IV.Special Tests

IV.A. Lock Rotor Test-N/A
IV,B. Bench Drop - Each sample must complete bench drop without loss of intended function.
No excessive deformation to the product will be allowed as a result ofthe bench drop.
IV.C. Output Torque - Each sample must achieve a minimum output torque of 100 in.lbs. (1 1.3Nm)with 1.5Ah pack.
IV.D. Chuck/Collet Run-Out - Each sample must be equal to or less than 0.4mm TIR when tested 1 .0 inchfrom the chuck's face. Both 3/8” and 3/16” test pins should be used.
IV.E. Drop Test (Tool and Battery) -- Electrical safety, functionality, and structural integrity must bemaintained after each drop . Seam gaps in excess of0.063-inch (1 .6mm) and excessive deformation are not allowed. Storedtools that come loose during drop shall not be considered as a drop test failure.